Thursday, April 03, 2008

Glasgow Socks complete!


The sock recipe is complete! A Bosnian toe, a turkish heel and Elizabeth Zimmermann's sewn cast off make a lovely snug sock. The pattern was adapted from Lucy Neatby's Cool Socks, Warm Feet.

I say adapted ... what I mean is adapted with many, many froggings, swear words, loss of heart and lots of tears.

I increased the toe to 80 sts initially; too big. 70 sts for the next attempt. It occured to me on the 2nd attempt that I'd made a pair of Lucy Neatby socks before - maybe I should go and see how many stitches I had for that pattern, as they fit really well. They had 60 stitches ... another frogging.

For a while there I was off - round and round to the afterthought heel. Waste yarn added without a problem.

The heel. Oh the heel. First attempt too big. Tried the second, smaller attempt on the second sock. Too small. Now both socks need their heels frogged and an in-between sized heel added. At least the after-thought heel made this relatively easy, but I was starting to lose hope at this point.

Finally, heels that fit! Now, onto the cast off (both socks were sitting on waste yarn while I used the needles for the heels).

Cast off as normal. Way, way, way too tight.

Cast off one socks with needles 1.25mm bigger. Too tight - can pull on at a push, but cutting off shin circulation *sigh*

Frog back a row on other sock; knit last row and cast off with the bigger needles. Tighter than previous attempt ... what the [insert expletive of your choice here] is going on here!!

Consult the oracle of the toe-up sock for advice and try Elizabeth Zimmermann's sewn cast off. Advise boy to leave the room before trying the socks on.

Perfect fit!!





Why is she taking pictures of her feet and not paying attention to me!? Very well, I shall bite her stupid socks *receives smack and scream from sock owner* ...


... I wonder what'll happen if I bite these? *another scream*



Fun at the New Lanark Mill on Monday. This was the walk to the Falls of Clyde and the nesting Peregrine Falcon at the end. Here I am below, looking all up for it, and stylish in my new fancy wellies...



... which were crafted by evil and far too narrow for my big boat feet. Every step back down was like razor blades on my poor footsies. It was 4.35pm, we were still walking back to the mill and I hadn't yet been to the New Lanark gift shop to score some yarn. Hysteria was setting in. Torn between walking faster and literally shearing my toes off, or walking slower and not getting yarn.
There was a point where the pain almost won, and a fleeting thought of "screw the yarn" may have crossed my brain, but it passed a nanosecond later.

I made it with 15 minutes to spare and dragged my limping, sobbing self over to the yarn, which was (of course) at the far end of the shop. Bought 20 balls of DK for £20.00 - it was worth it!



And these final two shots (both taken by the boy) were of Vane Farm - a lovely sunny hot day. I didn't wear my wellies, and had a great day.

Sunday, March 30, 2008

Kites and sites ...


The boy and I are on Easter hols this week, and have decided to be active, and get out and about in Scotland since our RSPB membership cards came in this week. Today we went to Stirling in search of nature. We spotted Hamish the Highland coo in a woollen mill next to Callander, surrounded by 3 coach loads of tourists armed with cameras. He just loved the attention...


We also stopped at Aberfoyle (great toilets) and popped up to the David Marshall Lodge. A lovely place with virtually tame birds at the seed hangers and tables; chaffinches, coal tits, siskins etc. Really enjoyable, spoiled only by the completely inappropriate noise-fest that is Go-Ape! (exclamation point part of their logo ... 'nuff said).

But the best place we visited was Argaty Red Kites - it was unexpected because we only stopped in as it was on the road we happened to be on. We timed it perfectly, arriving just after they'd been fed. There were lots of Red Kites flying and diving about. Click the pics above and below for a close up - they're tricky to photograph.



On the way back to the car the showers stopped and the sun came out. We took the opportunity, and the barn full of sheep, to take some pics of my latest FO - finished yesterday and so so toasty. It's another hat-shaped hat by old maiden aunt.


Readers who are wondering what happened to finishing all the WIPs before Beijing - this is another work in progress. I had already finished this some time last year, but it was far too big, and went into the 'WIPs that must be frogged and re-knit' pile.

There, I said it. I confess; I didn't photograph all the WIPs I have - there are more.



Saturday, March 01, 2008

Fourth time's the charm ...


The Lucy Neatby Toe Up Socks are finally going well ... on the fourth attempt.

1st attempt was the top down socks that were too small ....

2nd attempt I began trying the toe up option and got carried away with the increases. I increased to 80 stitches. After putting the stitches onto some waste yarn and trying them on I realised that they were way too big.

3rd attempt I chose the smaller size options in the pattern and went for 76 stitches - seemed about right. Still too big. *sigh*

It occured to me that maybe I should see how many stitches were on my previous pair of Lucy Neatby toe down socks and work from there ... there were 60 stitches. Quite a few less then!

4th attempt is 60 stitches and seems to be fitting perfectly so far. Only one and half inches to the heel too. I thought that I should read the heel instructions, and was delighted to discover that it's an after-thought heel (see Dec 18th post). This is something I've been wanting to try.



Look at him ... so cute isn't he? This is the same cat who has decided when he needs to be sick that the best place to do it is from the top of his climbing perch (5 feet high). He's done this a few times now ... onto to his fluffy cave bed, onto the newly plastered and painted walls, onto his scratch post. *sigh* I do love him, but sometimes I wish he'd just show me the common decency of throwing up on a newspaper, or even better, in the toilet.

And on that lovely note ... byee

Sunday, February 24, 2008

An FO and a new challenge


The Star Wars scarf is finally complete and blocking. Above is the view as you stare at it, and below is the side view when the text 'magically' appears.

It took 2 balls of white and 2 balls of black Cygnet Superwash DK. Having washed a swatch ... well a mistake actually - a swatch implies every went smoothly. I washed the mistake as I couldn't face a 3rd frogging. Anyway, having washed the 'swatch' I have discovered that this yarn doesn't do well in the 40 degree wash as it's label suggests. It went fuzzy. Whether this is due to the high contrast colours I don't know. Maybe it would be fine if it was just one colour *shrug*

All I know is that I'm going to have to handwash this after all, despite an extensive search for machine washable DK wool *sigh*

Negative aside - I love this. The boy loves it too, and that's the most important thing. Non-knitters are genuinely perplexed by this and have decided it requires lots of maths (it doesn't). Shadow knitting is playing with knit and purl stitches to make stitches 'stick out' so that shapes appear. Wikipedia explains it well.

My pattern was 11 stitches either side to serve as a margin, and 15 in the centre to use for the letters. I got the idea and chart from this Craftster with a slight modification. I was going to do the one side of the scarf with black lettering for the dark side, and one side with white lettering for the light side and sew them together. The fabric turned out quite thick though, and I just don't have it in me to knit another ...



And so onto another project that must be completed by the start of the Beijing Olympics (165 days to go). The Glasgow socks were cast on with too few stitches - it wasn't my fault. The gauge swatch lied again - by a whole stitch!! So I frogged in and thus was able to start a new project, without breaking the promise of casting on anything new before finishing all these wips.

Since it had to come out I was toying with the idea of trying toe-up socks. For some reason I was a bit scared, the thought of the challenge was daunting me. Then I snapped out of it - how many new things have I learned in the knitty world over the past 3 years? Loads! And then a sign; a Raveler contacted me out of the blue asking for all the wool ends I had on my trade board in excahnge for Lucy Neatby's Cool Socks, Warm Feet book.

Once again knitty fate has struck. I'm doing a toe-up pattern with a Bosnian toe - a rectangle knitted with a provisional cast on, so you can out it on a needle later, then pick up the stitches around the 2 other sides and have the beginnings of a toe!

I'm struggling a bit with the whole 'knit til it fits' concept - I prefer having everything set out for me the first time I embark on something new. After frogging 4 rows (as I went too far with my increases) I think I am on a smooth path for now (at least until the heel...)

Still it's fun doing a 'new' project.

I believe I said that I would be trying Rogue as my project for the Knitting Olympics. It was pointed out to me that the Olympics are a mere 2 weeks long ... I will be revising my idea of what I plan to do - I suspect a pair of DK socks may be a more achievable goal ...




The B&B has been booked for this year's Woolfest - I'm so excited!! Cumbria is a lovely place, made all the lovelier by the big barn full of lovely knitty goodness - yay!

And Creative Stitches at the SECC in a couple of weeks with my mum - I can't wait!

And K1 Yarns have opened a 2nd shop in Edinburgh, in the place of HK Handknits I think. Anyway, Debbie Bliss will be there on the 1st March for a grand opening. I feel dizzy with all the yarny joy!! (I know my credit cards do not feel the same)

Wednesday, February 13, 2008

Project Fatigue

Oh what enthusiasm my last post held ... to systematically work my way through all the projects which have started to become guilty burdens so that I could be 'organised'. It is probably telling through my lack of posts of late that project fatigue and the reality of this challenge have hit home.

To try and not overwhelm I have concentrated on only two projects;



Summertime tunic - a project as boring to photograph as it is to knit... and it's a shame as this is a lovely top, and I'll surely wear it frequently once it is done (should Glasgow weather allow of course). The yarn is stunning, with a lovely drape too.

But the miles and miles of knitting in the round are testing me, creating a project that is almost as torturous to those around me as it is to me, such is my whining about it. It stuck at 7 and half inches from the ribbing for about a week, no matter how much I knit. The 'never ever ever growing no matter how much I sodding well knit' phase usually precedes the 'oh crap, I've knit 2 inches too far' phase.

Well not in this case - it's started to move slowly again, now standing at just over 9 inches. It has to be 11 and a half inches... Keep rooting for me, as I'm losing the faith here.



The Force scarf is faring a little better. Yes that is the 'M' of 'May the force be with you'. The end is in sight. Not least because Summertime Tunic motivates me to stick with this over round and round and round.

I realise that this was a Christmas Day present and it is Valentine's Day tomorrow, however, in my defence, there were 3 of us at last night's meetup knitting Christmas presents. I am not alone - and those that love us knitters are used to receiving promises and presents on the needles for Christmas/Birthdays.

Since I haven't been knitting much, I haven't been blogging much. I'm pretty close to throwing in the towel and asserting that I knit for enjoyment. If I want to cast on 200 projects and not finish any of them, what harm am I doing, really? But in my heart it doesn't particularly make me happy to have piles of unfinished projects about - I started them because I loved them, and I still do. I want them finished.


So I ordered a long-lusted after book; "The Opinionated Knitter" by Elizabeth Zimmermann. If anyone can put the fun back into knitting it's her. I flicked through earlier and felt the urge to start knitting 'proper' once more. (I also felt the urge to cast on about 8 new projects, but let's not go there)

Another person has helped to keep me motivated in my Beijing challgenge, although she may not be aware of it. Lilith is doing the Race for Life - a women's 5K run to raises money for cancer research. She's doing in memory of her dad, and I'm in awe of her efforts. As she states "running comes as naturally to me as flying does to a penguin", therefore this is no easy feat. If she can do this (and in the icey, foggy, freezing weather we're having), then frankly I can sit on my bum and finish a few projects!

She is trying to raise £1000 and there are loads of fabulous knitty prizes up for grabs - every fiver you enter counts as an entry. So please go over there and donate some cash! I'm rooting for you Lilith!!

Friday, January 18, 2008

Only 202 days to go...

I have a resolution. I realise it's 18 days into the New Year already, but I was thinking about a resolution I really wanted to achieve this year instead of something like not buying yarn in 2008. That just wouldn't work out for me - I would have my knitting needles crossed as I said it.

So I have it: 202 days until the start of the
Beijing Olympics.

In these 202 days I want to either complete or frog the following wips so that I will be prepared to take on the Olympic knitting challenge - which this year will be the completion of
Rogue (stop laughing - I can do this!) I have gauged Rogue - I know the needle size I need, the yarn is bought - I'm practically finished already!




At the moment I'm working on the 3 projects above - The Force scarf is a concentration/home one, the Summertime Tunic is a knitting group/work one, and the crochet wrap is for when my hands hurt from too much knitting!


These blasted armwarmers are practically finished - I'm up to the thumb of the second one - it would take me a weekend. Why can't I just get on with it?!


Above is Luna Moth - I'm going to go easier on myself for this one. It does require extreme concentration and about a gazillion stitch markers. I'm about halfway there. A quiet day off could make a big improvement in this. I want it for summer too...


Glasgow night/Kingfisher socks *sigh* my gauge was 7.5 stitches - yes I gauged in the round. Surely this deserves a reward, right? But no. My actual gauge is 8.5 stitches. So these must be frogged back a bit and made into wristwarmers now. Just psyching myself upto gathering the stitches to frog.



The 2 Branching Out scarves; the top one I want finished for spring time. The second one is to be frogged - Kidsilk Haze blows. It's just urg to knit with.


Picking up Pinwheel and learning short row shaping to try and bring her back to life is one of my biggest challenges. I'm going to do it though... I am!



And finally; Jaywalkers. I'm on turning the heel of the 2nd sock so again, not far to go. We'll just keep quiet about how these were my last Olympic knitting project *whisper* in 2006...

Wish me luck!!

Monday, January 07, 2008

It's been a while...


... but I didn't want to blog until Earnshaw was done. And now it is! (Yes I am hugging the radiator - it's freezing in Glasgow, and daylight for decent photographs is but a distant memory)

Earnshaw has a couple of problems ...



... it is a little wide. In fact I could fit one and half of me in it.


It has a breathtakingly strange-looking hood ...


... and the sleeves were a tad long.



But it is most definately loved!


I can finally blog about The Force scarf for the boy. Currently at 'orce be with you'; it will eventually say 'May the Force be with you'. The idea being that the force is always with you even if see it you cannot...

Above is the front view, and below is from the side - it's called Shadow Knitting, and I believe it originated in Japan.

I got the idea from a girl on Craftster and thought it would be a great Christmas present for the boy. (Yes I did wrap it on the needles ... )




Whilst tidying away the Christmas decorations, the boy was struck with one of those 'episodes' - you know the ones: The 'we have to get organised, and clean, and sort things out in the house!!' That kind of thing.

I was in the living room knitting and pretending I couldn't hear him calling me to get involved in the Great Cleaning Episode. This worked until I heard the sound of something large being thrown on the floor followed by the words 'do you want this stuff or not? ... since you haven't used it in three years!' Curiosity piqued (and fear of Important Things being discarded without my overseeing eye) I shuffled through to see what the large 'thing' was.

Turns out it was a binbag containing, amongst other things, the Tupperware lollypop maker passed to me from my mum. Bringing back memories of my childhood in Cyprus I had to bring them back to life. Plus ice lollies made from cranberry juice have got to be a good detoxifying start to my new year diet, right?



Yum!

Thursday, December 06, 2007

Maybe it's time for a new hobby ...


I've joined the shoulder seams of Earnshaw - it's not a dress! In fact it fits just how I wanted it to. And I finished the sleeves and seamed one! And - because knitty karma is just not that nice to me - the sleeves look utterly stupid. I mean really really weird - I have points at my forearms. *le sigh*

So I have a plan. Why, by the way, must I always have to think of a plan? Why can't it work first time? Why!? Anyhoo, I digress... the plan is; to seam up the sides of the jumper, pick up the sleeves stitches and knit down the way. That way I can keep an eye on the sleeves in case they decide to form peaks.

Also knitting in the round is a must for garter stitch I have discovered. Mattress stitch on stocking stitch is a beautiful piece of magic, a miracle really. Mattress stitch on garter stitch edges looks like my cat had a go at knitting.




To remind me that it's not all bad, and sometimes good things can happen to good knitters; my finished replacement scarf with pockets. Lovely and cosy! I washed the Noro Silk Garden then soaked it in conditioner to soften it up - seems to have worked quite well. Cashmere it ain't, but it's still soft enough to wear next to the skin.

Oh well - suppose I better stop procrastinating and start frogging.